Procedures for Draw Releases

RFG follows inspector’s final budget for rehab draws
  • Use inspector’s completed report, not original estimate
  • No budget reallocations allowed
  • Borrower covers extra costs
Draw requests require 100% completed work
  • No partial work funded
  • Full line item completion needed
  • No pre-release for materials
Request draws via email
  • Third-party inspection ordered
  • Inspector contacts borrower in 1-2 days
  • Report received in 2-5 days
  • Funds sent within 1 day of report
  • Inspection fee deducted from draw amount
  • Borrowers pay Philadelphia area inspectors upfront. RFG won’t deduct this from draws. Inspectors may withhold reports if unpaid.
Draw releases via wire transfer only ($30 fee per draw):
  • RFG provides blank draw wire form:
    • Same entity: Any borrower can sign
    • Different entity: All borrowers must confirm in writing
  • RFG calls main guarantor to verify wire info
  • Draws sent only to borrowers, not contractors
RFG adds 10% contingency to repair budgets:
  • Held in escrow
Contingency released with final draw and may not be used for real location during work progress

Example: Original $50,000 budget + 10% contingency = $55,000

  • Four $10,000 draws = $40,000
  • Final draw of $10,000 plus $5,000 contingency funds released upon work completion.
  • If contingency removed prior to loan closing on exception basis by RFG, draws released at 90%. 10% contingency line items released with remaining draw funds.

Example: Original $50,000 budget with no contingency.

  • Four $10,000 draws = $40,000 – borrower receives $36,000 ($10,000 * 90% = $9,000 for each draw. $9,000 * 4 = $36,000. With $4,000 held in contingency.
  • Final draw of $10,000 + $4,000 contingency funds released upon work completion.
FINAL DRAW – Lien waiver required:
  • Contractor signs to prevent property liens
  • Borrower signs if acting as contractor
  • Protects borrower and RFG
  • Required for final draw or payoff
Other policies:
  • Current interest payments must be up-to-date
  • Draw process timing: 2-5 days for third-party inspections, 1-2 days for local inspectors
  • RFG relies on inspection reports, not borrower-provided photos
  • Required documents:
    • Roof warranty (new roofs only)
    • Septic system completion certificate
    • Sprinkler system completion certificate